Concrete parking lot building in Redding CA - a slab sized for the vehicles you park
Cracked, sinking or patched pavement out front? We pour a concrete lot on a packed base, sized for the traffic it carries.
Ask us to price your parking lot
Seeing the lot in person lets me check the ground and where water runs.
What does it take to build a concrete parking lot in Redding?
Concrete parking lot building in Redding means we prepare the ground, form and pour the concrete pavement, then finish the surface, so you end up with a lot built for the vehicles that use it. A concrete lot that's designed and built around its own traffic can give many years of service with little upkeep.
Most of these calls come from property owners and small businesses with a lot that's cracked, sinking or holding water, or with bare ground that needs to become parking. The price moves with the size of the lot, how much digging and base work the ground needs, how thick the slab has to be for what parks on it, and how much steel and forming it takes. The base is the first thing people want to trim and the last place I'd cut, because nobody sees it on day one and a nice finish over a poor base won't last. The schedule turns on any permit the job needs, the weather on pour day and the days the slab has to sit before traffic, and your written estimate spells out what's included for your lot.
How we handle concrete parking lot building
Before we size the slab, I ask what vehicles will use the lot, because a slab gets sized to what drives on it. Then we dig out the subgrade, the soil the slab sits on, and pack it firm instead of raking it level, since loose dirt settles and takes the concrete down with it. We set the grade so water runs off the lot and away from buildings, place rebar, the steel that holds a slab together, where the job calls for it, and pour. Our finishers give the surface a broom finish, a light texture that helps tires and shoes grip, then cut control joints, grooves that give the concrete a straight line to crack along instead of a random one, as soon as it can take the saw. While it cures, the wait while it hardens and gains strength, I help you plan where people will park so nobody pulls onto it early.
Some lots come with other work attached. If you're adding a carport, light poles or a small building beside the lot, we can pour the concrete footings for it in the same plan, and if a building next to the lot has settled, foundation raising brings it back up before new pavement goes against it.
Permits and ground for concrete parking lot building in Redding
The City of Redding issues permits for work in the public right of way, for grading, cuts and fills, and for clearing a parcel of more than an acre, and a new lot can involve some of that. Whether yours needs a permit depends on what the job turns out to be, so we check whether your address falls under the city or the county and work through it with that office as part of the job. We're based in Redding and work across the area, so we're used to dealing with both offices.
Much of the ground around Redding is what soil surveys call the Redding series, which drains well but sits over a duripan, a hard cemented layer, at moderate depth. That's true of some sites and not others, and since the soil under a lot shapes how thick the slab has to be, I look at the ground on each property before we size anything. It changes from one lot to the next on our jobs in Shasta Lake and Anderson too.
Why call us for parking lots
I walk the lot myself
I'm the one who comes out to look at your lot, and I'm on site running our finishers and laborers when we pour. The person who heard what you need is the one watching the concrete go down.
In business since 2013
I learned the trade on a flatwork crew, pouring the driveways, patios and slabs that lie flat on the ground, and started this business in 2013. Years on a restaurant kitchen line before that taught me the rush only goes right when the prep is done, and a pour works the same way.
Licensed and fully insured contractor
In California the Contractors State License Board licenses contractors, and paving a lot is licensed concrete work. We're licensed and fully insured, which is worth confirming with anyone you hire for a job this size.
Early pours on hot days
Redding summers run hot, so on those days we get the truck there in the cool of the morning. Concrete poured in midday heat dries too fast on top and can wear into a weak, dusty surface later.
- Phone
- (530) 319-6031
- Hours
- Mon–Fri: 6 AM–10 PM, Sat–Sun: 7 AM–11 PM
- Location
- Redding, CA 96001
Tell me what will park on it and we'll start there. Send your lot details or call (530) 319-6031.
Get a written estimate for your parking lot
Estimates are free, done on site and obligation-free. Send the form and we'll reply within one business day to set a time. Then I come out, look at the lot and the ground, and write out what's included so you can compare it side by side.
- Phone
- (530) 319-6031
- Location
- Redding, CA 96001
- Hours
- Mon–Fri: 6 AM–10 PM, Sat–Sun: 7 AM–11 PM
- Credentials
- Licensed and fully insured.
Frequently asked questions
How thick should a concrete parking lot be?
It should be thick enough for the vehicles that use it, on the ground it sits on, with the strength of the concrete being poured, so there's no single number for every lot. Driveways and parking areas that take light trucks may need thicker pavement than lots that only park cars. Tell me what drives on yours and I'll size it once I've seen the ground.
How long does new concrete need to cure before cars can park on it?
Keep cars off a new slab for 3 days and trucks off for 7, unless tests show the concrete has already gained enough strength. For a business that usually means planning other parking for about a week. If you need the lot back sooner, ask before the pour whether strength tests could open it earlier.
What does a concrete parking lot cost in Redding?
It depends on the lot, and I give you a number only after I've seen it. Tearing out old asphalt or concrete, soft ground that needs more base and truck traffic that calls for a thicker slab all push the price up, while a plain broom finish keeps it lower than color or a stamped pattern. Your written estimate puts the figure and what it covers on paper.
Does my parking lot need accessible parking spaces?
If your business is open to the public, the accessibility rules in the California Building Code have to be considered when the lot is designed, built or changed. A contractor who ignores them can face license discipline from the state board and civil liability, so the layout of those spaces needs to be settled before any concrete goes down. I'll bring it up when I look at your lot.
What causes problems when concrete is poured in hot weather?
Heat makes cement set faster and concrete dry faster, which can cause trouble delivering, placing and curing it and hurt how well the slab holds up. One concrete products maker says crews shouldn't add water to fresh concrete to cool it or make it easier to work, because that water can cost strength and durability. It's fair to ask any crew how they'll keep the mix workable on a hot day without it.
How do I get an estimate for a concrete parking lot in Redding?
Call (530) 319-6031 or send the form with the property address, the rough size of the lot and the vehicles that will use it. With that I can come out ready to look at the right things, and the estimate comes back written out so you can see what's included.
Other work that goes with a new lot
Concrete footings
Putting up a carport, light poles or a small building beside the new lot? Footings carry those loads down into firm ground, which keeps them from settling.
Foundation raising
If the building beside your lot has dropped at a corner, raising its foundation brings it back up so the new pavement meets it level.

